Rates & Fees
RESOLUTION
The
Madison Suburban
Utility
District,
(District) by
and through the
action of its
Board of
Commissioners,
moved to adopt
this resolution
to increase its
rates for
certain
customers, and
to increase a
second category
of rates, namely
for fire
sprinkler
heads.
These rates are
best described
by the following
graph:
WATER
RATE SCHEDULE BY
CUSTOMER CLASS
RENDERED AFTER
AUGUST 31, 2009
|
MINIMUM
MONTHLY
BILLING
(includes up
to 100 cubic
feet) |
|
METER SIZE |
RESIDENTIAL |
COMMERCIAL |
|
|
|
Small
|
Intermediate
|
Large
|
|
* 5/8" |
$4.50 |
$5.50 |
$13.85 |
$597.23
|
|
3/4" |
10.62 |
11.32 |
19.64 |
603.69 |
|
*1" |
12.77 |
13.63 |
21.51 |
605.80 |
|
*1 1/2" |
18.77 |
20.03 |
26.71 |
611.60 |
|
2" |
25.29 |
26.97 |
32.63 |
618.22 |
|
3" |
33.38 |
35.61 |
40.84 |
624.04 |
|
4" |
54.41 |
58.03 |
64.65 |
650.65 |
|
6" |
85.42 |
91.12 |
99.81 |
689.96 |
|
8" |
133.59 |
142.50 |
155.38 |
755.41 |
|
10" |
133.59 |
142.50 |
155.38 |
755.41 |
|
12" |
133.59 |
142.50 |
155.38 |
755.41 |
|
Usage
Charges per
100 cubic
feet after
minimum
|
|
Above 100 cf
to 1200 cf |
$1.97 |
$2.10 |
$2.14 |
$1.81 |
|
Above 1200
cf
|
$2.33 |
$2.48 |
$2.14 |
$1.81 |
Class Criteria
Residential: up to
two housing units
on a common water
meter
Small Commercial:
up to 1,600 cubic
feet per month
Intermediate
Commercial:
1,600-200,000
cubic feet per
month
Large Commercial:
over 200,000 cubic
feet per month
* These are the
three residential
meters currently
in service at MSUD.
* Minimum bills
for Residential
and Small
Commercial 5/8?s
inch meter sizes
will see no
increase
WATER RATE
SCHEDULE BY
CUSTOMER CLASS
RENDERED AFTER
JANUARY 31, 2010
|
MINIMUM
MONTHLY
BILLING
(includes up
to 100 cubic
feet) |
|
METER SIZE |
RESIDENTIAL |
COMMERCIAL |
|
|
|
Small
|
Intermediate
|
Large
|
|
* 5/8" |
$8.50 |
$9.50 |
$17.85 |
$601.23
|
|
3/4" |
14.62 |
15.32 |
23.64 |
607.69 |
|
*1" |
16.77 |
17.63 |
25.51 |
609.80 |
|
*1 1/2" |
22.77 |
24.03 |
30.71 |
615.60 |
|
2" |
29.29 |
30.97 |
36.63 |
622.22 |
|
3" |
37.38 |
39.61 |
44.84 |
628.04 |
|
4" |
58.41 |
62.03 |
68.65 |
654.65 |
|
6" |
89.42 |
95.12 |
103.81 |
693.96 |
|
8" |
137.59 |
146.50 |
159.38 |
759.41 |
|
10" |
137.59 |
146.50 |
159.38 |
759.41 |
|
12" |
137.59 |
146.50 |
159.38 |
759.41 |
|
Usage
Charges per
100 cubic
feet after
minimum
|
|
Above 100 cf
|
$2.33 |
$2.48 |
$2.14 |
$1.81 |
Class Criteria
Residential: up to
two housing units
on a common water
meter
Small Commercial:
up to 1,600 cubic
feet per month
Intermediate
Commercial:
1,600-200,000
cubic feet per
month
Large Commercial:
over 200,000 cubic
feet per month
* These are the
three residential
meters currently
in service at MSUD.
* Minimum bills
for Residential
and Small
Commercial 5/8?s
inch meter sizes
will see no
increase
Proposed Fire
Sprinkler Head
Rate
For bills
rendered after
August 31, 2009
Monthly Minimum of
$15.31 without any
allowance for
number of
sprinkler heads
plus $ .055 per
sprinkler
head.
This is a MONTHLY
BILLING as opposed
to the current
annual billing.
FEE SCHEDULE
--
Effective March
18, 1996
LETTER OF
AVAILABILITY
FEES --
Letter of
Availability *
$50.00 per lot
IN-HOUSE
PLANS REVIEW
FEES
In-House Small
Plans Review *
$200.00 minimum
Includes Plat
Signing and /or
Letter of
Availability
plus any
District
man-hours above
2 hours
plus any
Attorney
man-hours
In-House Medium
Plans Review *
$300.00 minimum
Includes Plat
Signing and /or
Letter of
Availability
plus any
District
man-hours above
4 hours
plus any
Attorney
man-hours
In-House Large
Plans Review *
$400.00 minimum
Includes Plat
Signing and /or
Letter of
Availability
plus any
District
man-hours above
6 hours
plus any
Attorney
man-hours
* Currently
(1996), District
man-hours fees
are based on
$50.00 per man
hour. Should
District
man-hours fees
increase, the
above fees will
be modified to
reflect the
increase
accordingly, The
District is not
obligated at any
time to perform
In-house Reviews
when it may be
deemed
appropriate by
management to
turn same over
to the
District's
Engineers for
review. At that
time, the
Developer Plans
Review Fees will
apply. Any
System Mapping
will be charged
at the Standard
Engineer fee
rates with a
minimum of
$100.00 fee for
same.
Partially
revised 2004
DEVELOPER PLANS
REVIEW FEES
Developer Small
Plans Review **
$600.00 minimum
Includes Plat
Signing and /or
Letter of
Availability
System Mapping
plus any
Engineering
man-hours above
3 hours
plus any
District
man-hours above
2 hours
plus any
Attorney
man-hours
Developer Medium
Plans Review **
$900.00 minimum
Includes Plat
Signing and /or
Letter of
Availability
System Mapping
plus any
Engineering
man-hours above
5 hours
plus any
District
man-hours above
2 hours
plus any
Attorney
man-hours
Developer Large
Plans Review **
$1200.00 minimum
Includes Plat
Signing and /or
Letter of
Availability
System Mapping
plus any
Engineering
man-hours above
7 hours
plus any
District
man-hours above
2 hours
plus any
Attorney
man-hours
** Currently
(1996),
Engineering Fees
are based on
$100.00 per
man-hour;
Attorney Fees
are based on
$100.00 per
man-hour; and
District fees
are based on
$50.00 per
man-hour. Should
Engineering
Fees, Attorney's
Fees, or
District
man-hours costs
increase, the
above fees will
be modified to
reflect the
increase
accordingly. The
District is not
obligated to
expand its
efforts to
review plant to
reduce
Engineering Fees
or Attorney's
Fees. As of
August 16, 2001
Attorney Fees
were increased
to $125.00 per
man-hour.
Partially
revised 2004
ADDITIONAL FEES
Inspection Fee
*** $100.00
minimum Fee
plus any
District
man-hours
above 1 hour
Pressure Testing
Fee $100.00 per
test
Sampling Fee
$50.00 per
sample
Includes testing
for bacteria and
chlorine
residual
Cross-Connection
Fee $100.00
minimum Fee
Applicable for
new developments
plus any
District
man-hours
or expansions of
existing
facilities above
1 hour
TDOT Indemnity
Contract Fee
$250.00 per
location
Variance Appeal
Fee $100.00 per
location
Tapping the Main
Fee
Developer
furnishes,
installs and
readies
tapping sleeve
and valve for
the tapping
process
6" - $ 600.00,
8" - $ 800.00,
10" - $ 1000.00,
12" - $ 1200.00
*** Currently
(1996), District
man-hour fee are
based on $50.00
per man-hour
should District
man-hour fees
increase, the
above fees will
be modified to
reflect the
increase
accordingly.
Partially
revised 2004
Effective Date
July 1, 2004
SPRINKLER
PRIVILEGE FEE
|
SIZE |
FEE |
|
3/4" |
$250.00 |
|
1" |
$350.00 |
|
1
1/2" |
$400.00 |
|
2" |
$500.00 |
|
3" |
$750.00 |
|
4" |
$1000.00 |
|
6" |
$1500.00 |
|
8" |
$2000.00 |
|
10" |
$3000.00 |
|
12" |
$5000.00 |
DEVELOPER
INSTALLED FIRE
HYDRANT
PRIVILEGE FEE
$1000.00
all sizes off of
existing or new
main
COMMERCIAL/INDUSTRIAL
ANNUAL SPRINKLER
HEAD FEE (Fire
Protection)
Annual minimum
$50.00 for up to
167 heads for
any size
All heads above
167 heads
charged at $.30
per head per
year
SAME DAY/AFTER
HOURS/TURN
ON/ADDITIONAL
FEE
In addition to
the Customer
Connection Fee
to establish new
service any
customers
wanting same day
turn on service
or after hours
turn on service
or if customer
has to be left
off in box and
requires an
extra-trip to
turn on then a
$30.00 service
charge will be
assessed.
SAME DAY/AFTER
HOURS BACKFLOW
ADDITIONAL
INSPECTION FEE
$30.00/device
SERVICE CHARGES
(applied on
attempt to
collect)
|
SIZE |
FEE |
|
|
Res.
Com. |
|
5/8" |
$30.00
$40.00 |
|
1" |
$40.00
$50.00 |
|
1
1/2" |
$65.00 |
|
2" |
$75.00 |
|
3" |
$100.00 |
|
4" |
$150.00 |
|
6" |
$250.00 |
|
8" |
$500.00 |
|
10" |
$1000.00 |
|
12" |
$2000.00 |
FIRE HYDRANT
FEES
SIZE - FEE
6" -
$3,500.00
8" - $3,500.00
10" - $4,500.00
12" - $4,500.00
16" - $6,500.00
18" - $8,000.00
20" - $8,000.00
24" - $8,000.00
Fees for Fire
Hydrants on same
side of main.
Pricing does not
include asphalt
or concrete
work.
CONNECTION /
DEPOSIT FEES
Meter
Madison
Metro
Goodlettsville
size
water
/
sewer
/
sewer/
connection
deposit
connection
OWNER
RENTER
Res.
3/4" $50.00 $100.00
$ 25.00
$
50.00
1"
$100.00
$100.00
Comm.
3/4"
$100.00
$
35.00
$100.00
1"
$125.00
$75.00
$100.00
1
1/2"
$150.00
$85.00
$100.00
2"
$200.00
$100.00
$100.00
3"
$300.00
$150.00
$100.00
4"
$450.00
$250.00
$100.00
6"
$600.00
$500.00
$100.00
8"
$800.00
$1000.00
$100.00
MADISON SUBURBAN
UTILITY DISTRICT
Water
Developer
Installed
Tap
Size
With Meter
Tap Privilege
Fee
Meter Fee
3/4"
Developer
+ $
250.00
$ 250.00
1"
Developer
+
350.00
350.00
1
1/2"
Developer
+
400.00
550.00
2"
Developer +
450.00
650.00
3"
Developer +
750.00
2,700.00
4"
Developer +
1000.00
3,700.00
6"
Developer
+
1,500.00
5,700.00
6” Dom/Fire
Developer +
1,500.00
7,700.00
8" Dom/Fire
Developer
+ 2,000.00
9,700.00
10"
Developer
+ 3,000.00
** + 160.00
12"
Developer
+
4,000.00 **
+ 160.00
*
Inspection Fees,
Metro Excavation
Fees, Road
Crossings,
Asphalt, and
Concrete are
additional costs.
These costs
vary, depending on
the individual
circumstances, and
must be figured by
the job.
**
Developer to
acquire meter from
other sources but
according to
District
Specifications.
CUSTOMER SERVICE
FEE SCHEDULE
Broken Lock fee
$25.00
Broken Saddle
fee $25.00
Return Check fee
$20.00
Transfer of
Service fee
$30.00
Broken Cut-off
$75.00
Annual
Cross-Connection
Testing Fee
$50.00
15 Day Service
$25.00
Home -
About MSUD -
Policies -
View/Pay Bills
-
Printable Forms
-
Contact Us